Norfolk Dredging turned an open field into berths for ocean going LNG ships. With an extraordinarily demanding schedule, construction of the docks began in a field with no water access. The dredge CHARLESTON transformed a mass of land 10 ft. above the water into a 42 ft deep berth ahead of schedule while construction of docks, piers, and roads encompassed her. Approximately 3,000,000 CY of sand, clay, silt, and rock were pumped on over 28,000 feet of pipeline during this project.
Tags: Charlestion Dredge, Dredge, dredge river, dredging, dredging services, hydraulic dredging, international dredging, LNG, LNG Ships, maintenance dredge, maintenance dredging, Norfolk Dredging, sand dredge, sand dredging